Case · Industrial
Data center Tier III — GAM
Uptime-Institute-certified Tier III data center with N+1 redundancy in electrical and mechanical, integrated into an existing building without affecting client operations.
Location
Gran Área Metropolitana
Area
4,200 m²
Duration
13 months
Delivered
2024
The challenge
Uptime-Institute-certified Tier III data center with N+1 redundancy in electrical and mechanical, integrated into an existing building without affecting client operations.
The solution
Construction design with planned electrical cuts in maintenance windows, temporary UPS connection during transfer, and Cx Level-3 commissioning.
Results
- Tier III certification on time.
- Zero downtime in client operations during integration.
- Post-commissioning PUE: 1.42.
Client
Confidencial — proveedor regional de cloud