Centro logístico — Coyol Free Zone
Class-A 12,000 m² distribution center with a compressed 14-month timeline to support the client’s regional operations, against material-cost inflation pressure.
Location
Coyol Free Zone, Alajuela
Area
12,000 m²
Duration
14 months
Delivered
2024
The challenge
Class-A 12,000 m² distribution center with a compressed 14-month timeline to support the client’s regional operations, against material-cost inflation pressure.
The solution
ICC took integral direction from concept. Lean Construction was applied to reduce waste, fast-track was used between permits and construction, and early steel procurement locked in costs.
Results
- Delivered on schedule, within the original 14% contingency.
- Zero recordable accidents on site.
- Client operating permit activated in the delivery week.
Client
Confidencial — operador logístico multinacional